2006 Land Rover Range Rover Supercharged Clean Car Fax Park Tronic We Finance! on 2040-cars
Farmingdale, New Jersey, United States
Engine:4.2L 4196CC V8 GAS DOHC Supercharged
For Sale By:Dealer
Body Type:Sport Utility
Transmission:Automatic
Fuel Type:GAS
Warranty: Vehicle does NOT have an existing warranty
Make: Land Rover
Model: Range Rover
Options: Leather, Compact Disc
Trim: Supercharged Sport Utility 4-Door
Safety Features: Anti-Lock Brakes, Driver Side Airbag
Power Options: Air Conditioning, Cruise Control, Power Windows
Drive Type: 4WD
Mileage: 101,054
Doors: 4
Sub Model: Supercharged
Engine Description: 4.2L V8
Exterior Color: Blue
Interior Color: BIEGE WITH BLUE PIPING
Number of Cylinders: 8
Land Rover Range Rover for Sale
- 510hp / 461trq low miles black on black navigation bluetooth 19" wheels
- 2006 range rover sport hse black w camel interior-clean-never wrecked(US $17,500.00)
- 2008 supercharged used 4.2l v8 32v automatic four wheel drive suv premium(US $37,991.00)
- 2013 land rover range rover hse msrp export ready! vision assist 22s 100% loaded(US $116,800.00)
- 2008 land rover range rover supercharged 4x4 dvd 56k mi texas direct auto(US $37,980.00)
- Range rover evoque pure plus navigation hd/sat radio only 40 miles leather(US $46,990.00)
Auto Services in New Jersey
Xclusive Auto Leasing ★★★★★
Willie`s Auto Body Works ★★★★★
United Motor Service ★★★★★
Ultrarev Inc ★★★★★
Turnersville Transmission Center ★★★★★
Troppoli Automotive Used Cars ★★★★★
Auto blog
Jaguar Land Rover opens winter testing facility in Minnesota
Wed, 12 Dec 2012As it begins the rollout of the all-wheel-drive Jaguar XJ and XF models, Jaguar Land Rover has just announced that it has opened a new facility in northern Minnesota for winter testing. Located in International Falls, MN (on the US and Canadian border), the British automaker says it is one of the coldest locations in the Continental US. Jaguar's new Instinctive All Wheel Drive system was developed primarily to help sell more cars in the northern US, so it only makes sense to open a testing area in the US as well.
With temperatures that can drop to minus 55 degrees Fahrenheit, International Falls was chosen to mimic some of the worst weather a Jaguar or Land Rover will ever see. The grounds house testing chambers, various road surfaces and even a frozen lake. This new facility complements the hot-weather testing grounds in Phoenix, AZ.
The official press release is posted below.
Jaguar and Land Rover to consolidate dealerships
Thu, 29 Nov 2012Jaguar and Land Rover are set to merge their sales facilities, according to Inside Line. Jaguar Land Rover North America President Andy Gross says 45 percent of Jaguar owners also have an SUV in their stable, so it makes sense to give customers as much exposure to the cat's high-riding cousins and possible. The number of overall outlets will remain the same, and the brands will reportedly remain separate on the showroom floor, however.
So far, just one dealer has made the move to combine under the roof of one 68,000 square-foot facility in Paramus, New Jersey (above), though a further 20 are ready to make the shift and become Jaguar Land Rover outlets. Gross believes the shift is necessary so that his company's dealer network will accurately reflect the company's products. We'll see how cozy the brands are when Jaguar starts rolling out its own SUVs in a few years.
Jaguar opens new engine plant in the UK
Thu, 30 Oct 2014The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.