2004 Toyota Sienna Ltd on 2040-cars
Roswell, Georgia, United States
Engine:6
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Make: Toyota
Cab Type (For Trucks Only): Other
Model: Sienna
Warranty: Vehicle does NOT have an existing warranty
Mileage: 137,648
Sub Model: LTD
Exterior Color: Silver
Disability Equipped: No
Interior Color: Other
Doors: 4
Drive Train: Front Wheel Drive
Toyota Sienna for Sale
- Xle 3.0l cd front wheel drive tires - front all-season tires - rear all-season
- 06 sienna xle limited gps-navi tv/dvd rear cam certified warranty we finance!!!(US $14,995.00)
- 2005 gold v6 leather dvd 3rd row minivan(US $13,700.00)
- Great value(US $5,991.00)
- 2000 sienna le 55000 miles!! one owner! consignment sale! no dealers sales tax!!(US $8,486.00)
- Excellent condition! - viewpoint rear entry - manual ramp - wheelchair van
Auto Services in Georgia
World Toyota ★★★★★
Watson/Boyd Auto Repair ★★★★★
Trantham`s Service Center & Wrecker Service ★★★★★
Thomson Automotive Parts ★★★★★
Suwanee Park Auto Service ★★★★★
Summit Racing Equipment ★★★★★
Auto blog
Toyota temporarily idles pair of Indian plants due to labor unrest
Thu, 20 Mar 2014The Detroit News reported today that Toyota will restart production at two Indian plants, following a shutdown on Monday.
Factory labor, management and police in Asia engage in the kind of violent altercations that we're not used to, having almost entirely walked away from the overtly brutal relations epitomized by the Pinkerton Detective Agency and the Flint Sit-Down Strike. In India, a plant owned by a Ford transmission supplier plant was shut down in 2009 after incidents between workers and armed men around the same time as Ssangyong workers occupied a factory in South Korea, in 2012 Suzuki Maruti workers rioted over wages around the same time upset employees beat a ceramics factory president to death in retaliation for a labor leader's killing.
Toyota is the latest to company trying to avoid that road. The Detroit Free Press reported earlier this week that it shut down two plants in India after 11 months of acrimonious wage negotiations and arbitration have gone nowhere. Toyota said the plant workers in Bidadi, near Bangalore, had deliberately stopped production at times over the past 45 days and threatened management. The workers said they wanted their wages raised by an amount already agreed to by management, but that management had reneged; news reports weren't clear on the amount, some saying nearly 10,000 rupees ($165 US) more per month, another saying 4,000 rupees ($65 US), but reports agree that Toyota has said it will only go as high as 3,050 rupees ($50 US).
Toyota mini doc chronicles Tundra towing Space Shuttle Endeavor
Thu, 21 Mar 2013Toyota has worked up a quick video detailing the brand's involvement in the transportation of the Space Shuttle Endeavour last year. As you may recollect, the California Science Center ran into a hitch when it came to moving Endeavour from LAX to its new home. While most of the route would be covered by a robotically controlled transporter, one portion of the route directed the shuttle over an interstate. Unfortunately, the bridge across wasn't designed to stand up to the weight of the shuttle and its motorized sled.
The Science Center would have to remove Endeavour from its transporter and place it on a lighter, non-motorized sled. That's where longtime Science Center sponsor Toyota came in. As it turns out, the automaker had to prove to the California Science Center that a Tundra could actually tow the massive shuttle, so engineers put on a little demonstration with a stock truck pulling the equivalent weight over flat ground for the same distance. Once the Science Center was satisfied that the Tundra could pull it off, the move was green lit and the rest is history. Check out the short documentary below for yourself.
180,000 new vehicles are sitting, derailed by lack of transport trains
Wed, 21 May 2014If you're planning on buying a new car in the next month or so, you might want to pick from what's on the lot, because there could be a long wait for new vehicles from the factory. Locomotives continue to be in short supply in North America, and that's causing major delays for automakers trying to move assembled cars.
According to The Detroit News, there are about 180,000 new vehicles waiting to be transported by rail in North America at the moment. In a normal year, it would be about 69,000. The complications have been industry-wide. Toyota, General Motors, Honda and Ford all reported experiencing some delays, and Chrysler recently had hundreds of minivans sitting on the Detroit waterfront waiting to be shipped out.
The problem is twofold for automakers. First, the fracking boom in the Bakken oil field in the Plains and Canada is monopolizing many locomotives. Second, the long, harsh winter is still causing major delays in freight train travel. The bad weather forced trains to slow down and carry less weight, which caused a backup of goods to transport. The auto companies resorted to moving some vehicles by truck, which was a less efficient but necessary option.